Topaz Data Center fabrication-ready BIM coordination model by RBS Dynamic.
ServicesBIM Services

Coordination that the field actually builds from.

Most BIM coordination stops at clash-free. We go further. Our models preserve the downstream fabrication constraints that matter: hanger locations, support spacing, insulation clearances, assembly sequences, service access. The result is a model your fabricator can build from without re-engineering it and your field team trusts enough to actually use.

Request a Quote

Tell us about your project. We reply within one business day.

The Problem

Clash-free is not the same as buildable.

The industry standard for BIM coordination is LOD 350. Models that are clean on screen but missing the details that matter in the field. Hangers are not placed. Insulation clearances are assumed. Service access is not checked. The result is a model your field team opens once, decides they cannot trust, and never opens again. The BIM investment is wasted and the coordination work ends up being done in the field anyway, at full rework cost.

40%

of MEP rework caused by coordination failures between trades

$15B+

annual cost of rework in US commercial construction

65%

of field teams say BIM models do not match what they need to install

Our Standard

Your LOD. Field-Proven.

We deliver to whatever level of detail your project requires. From design-level coordination through fabrication-ready models. You get exactly what the field needs to build from, not what looks good in a presentation.

Fully coordinated 3D MEP model delivered to your required LOD
Comprehensive clash detection and resolution reporting
Hanger and support placement for all major systems
Insulation clearance verification
Service access clearance validation
Sleeve and penetration drawings for structural coordination
Installation sequence documentation
Field team walkthrough and model validation
From Our Portfolio

Real Coordination Models

Topaz data center BIM coordination, full facility model with structural, MEP, and equipment yard
Topaz Data Center
Full building isometric BIM model
Building Isometric
Healthcare facility BIM coordination
Healthcare Coordination
The Difference

Typical BIM Firm vs. RBS Dynamic

FeatureTypical BIM FirmRBS Dynamic
Level of DetailLOD 300-350Scoped to your project, through fabrication-ready when needed
Hanger & Support ModelingRarely includedAlways included
Insulation ClearancesAssumed, not verifiedVerified in model
Service Access ClearancesNot checkedValidated for every system
Field Team WalkthroughOptionalStandard on every project
Our Process

Four Phases to Field-Ready

01

Discovery & Model Audit

Week 1

We review your existing models, drawings, and project specs. We identify gaps in LOD, missing systems, and coordination risks before work begins. No surprises downstream.

02

System-by-System Modeling

Weeks 2-4

We model each MEP system to whatever level of detail your project requires, including hangers, supports, insulation, and service clearances when needed. Every component is placed where it will actually be installed, not just where it fits on screen.

03

Multi-Trade Coordination

Weeks 3-5

We run clash detection across all trades (Mechanical, Electrical, Plumbing, Fire Protection, and Structural). Every identified conflict is resolved in the model before it reaches the field. Our process is built to catch problems early, not pass them downstream.

04

Field Validation & Handoff

Week 5+

We walk the model with your field team. If they cannot read it, use it, or trust it, we fix it. We export fabrication-ready deliverables and stay available through installation.

Also Available

On-demand VDC leadership.

Not every firm needs a full-time VDC director. Some need one for a specific project. Some need one to build a program from scratch and then hand it off. We provide executive-level VDC strategy, team mentorship, and workflow standardization on a fractional basis, without the overhead of a full-time hire.

Technology roadmap development and annual planning
Team mentoring and skills development
Workflow standardization and BIM standards authoring
Owner meeting representation and deliverable strategy

Fractional VDC engagements are scoped monthly. Typical engagements run 3 to 12 months.

Trades We Coordinate

Every MEP System, One Model

Mechanical / HVAC

Ductwork, piping, equipment, VAV boxes, air handling units, chillers, boilers. Full routing with hanger placement and insulation clearances.

Electrical

Conduit routing, cable tray, panel locations, switchgear, transformers, lighting layouts. Coordinated with mechanical for ceiling space allocation.

Plumbing & Fire Protection

Domestic water, waste, vent, storm, medical gas, fire sprinkler mains and branches. Slope verification and drain point coordination.

Structural Coordination

Penetration coordination with structural elements. Sleeve drawings, beam/column clearance verification, seismic bracing coordination.

Our Toolkit

Platform Agnostic

We work with whatever tools your project requires. Our team has deep experience across all major BIM platforms, and we coordinate across mixed-platform environments daily.

Revit
Navisworks
AutoCAD MEP
Tekla Structures
BIM 360 / ACC
Procore
PlanGrid
Bluebeam Revu
SysQue
Fabrication CADmep
BIM Track
Data center MEP
Sectors We Serve

Complex Projects. Any Sector.

Data Centers

N+1 to 2N+1 redundancy

Healthcare

ICRA-compliant coordination

Higher Education

Lab and research facilities

Commercial Office

High-rise and campus

Industrial

Manufacturing and cleanroom

Hospitality

Hotels and mixed-use

Government

Federal and municipal

Mission Critical

Zero-downtime environments

Building a data center?

National-scale Data Center BIM coordination. LOD 400, field-tested, fabrication-ready.

Data Center BIM
Our Doctrine
“If the field isn’t using it, it failed.

Every model we ship is measured against one standard: did the crews who installed it actually use it.

Ready for coordination that the field actually uses?

Tell us about your project. We will give you a straight answer on timeline, scope, and price. No fluff, no bait-and-switch.